Residential Units in the New Administrative Capital (R2 Area)
September 1, 2017
Misr Beni Suef Cement Company
May 1, 2020

Culvert Works Project on the Tunnel to Ras Al-Naqab Road

Project Summary

Saqr General Contracting proudly executed the Culvert Works Project on the Tunnel to Ras Al-Naqab Road, a strategic infrastructure development in the Sinai Peninsula. This ambitious project aimed to enhance connectivity, support economic growth, and ensure the safety and longevity of one of Egypt's most crucial transportation corridors.

Scope of Work:

  • Excavation and Earthworks: Precision excavation to prepare the site for the installation of advanced drainage systems, ensuring high-quality groundwork.
  • Culvert Construction:
    • Installation of a significant number of culverts designed to withstand extreme conditions and ensure optimal water flow.
    • Construction of reinforced concrete slabs to effectively channel water and protect the road infrastructure from flooding and erosion.
  • Engineering Excellence: Utilized cutting-edge technology and innovative engineering solutions to mitigate flood risks, ensuring the road's resilience and longevity.

Key Achievements:

  • Saqr General Contracting successfully completed the project within the allocated timeframe and budget, highlighting the company’s exceptional project management skills and ability to deliver under pressure.
  • The project was executed with a strong commitment to safety and quality, contributing to the long-term functionality of this critical infrastructure.

Significance of the Project:

This project is a cornerstone in Egypt’s efforts to improve its transportation infrastructure, enhancing regional connectivity between Egypt, Jordan, and Saudi Arabia. Saqr General Contracting played a key role in ensuring the road’s resilience against flash floods, promoting uninterrupted and safe travel while supporting future economic development in the region.

Through this project, Saqr General Contracting demonstrated its commitment to providing world-class engineering solutions and reaffirmed its position as a leader in the construction industry, capable of handling large-scale, high-stakes projects with exceptional efficiency and expertise.

Client:

Military Engineers Authority

Project Duration:

The project was completed within 3 months, reflecting Saqr General Contracting's professionalism and ability to manage and execute major projects within specified timelines and with the highest standards of quality.